Maximum Permissible Spans in Metres in Load Case H |
|
|
|
| |
Requirements
 |
Uniform load |
 |
Allowance must be made for the dead load of the
panel |
|
|
|
 |
Equal span widths |
 |
fperm. = l/200 |
 |
Loading on a span basis is not taken into account |
|
|
|
 |
Creep deformations and dead loads are not taken
into account in the tables |
|
|
|
 |
Values only apply to K1multiplan in accordance
with permit Z-9.1-242 |
|
| |
|
|
|
|
|
|
|
|
|
| Single span beam |
Load
q [kN/m2] |
Top layer
= 6.7 mm
Panel thickness |
Top layer
= 13mm
Panel thickness |
20
mm |
26
mm |
30
mm |
35
mm |
40
mm |
40
mm |
45
mm |
50
mm |
55
mm |
60
mm |
65
mm |
70
mm |
75
mm |
| 1 |
1.39 |
1.77 |
2.0 |
2.20 |
2.39 |
2.64 |
2.94 |
3.23 |
3.51 |
3.79 |
4.05 |
4.31 |
4.55 |
| 1.5 |
1.21 |
1.54 |
1.74 |
1.99 |
2.16 |
2.31 |
2.57 |
2.82 |
3.07 |
3.31 |
3.54 |
3.76 |
3.98 |
| 2 |
1.10 |
1.40 |
1.58 |
1.81 |
2.01 |
2.10 |
2.33 |
2.56 |
2.79 |
3.01 |
3.22 |
3.42 |
3.62 |
| 2.5 |
1.02 |
1.30 |
1.47 |
1.68 |
1.87 |
1.95 |
2.17 |
2.38 |
2.59 |
2.79 |
2.99 |
3.18 |
3.36 |
| 3 |
0.96 |
1.22 |
1.38 |
1.58 |
1.76 |
1.83 |
2.04 |
2.24 |
2.44 |
2.63 |
2.81 |
2.99 |
3.16 |
| 3.5 |
0.91 |
1.16 |
1.31 |
1.50 |
1.67 |
1.74 |
1.94 |
2.13 |
2.31 |
2.49 |
2.67 |
2.84 |
3.00 |
| 4 |
0.87 |
1.11 |
1.26 |
1.43 |
1.60 |
1.66 |
1.85 |
2.04 |
2.21 |
2.39 |
2.55 |
2.71 |
2.87 |
| 4.5 |
0.84 |
1.07 |
1.21 |
1.38 |
1.54 |
1.60 |
1.78 |
1.96 |
2.13 |
2.29 |
2.46 |
2.61 |
2.76 |
| 5 |
0.81 |
1.03 |
1.17 |
1.33 |
1.49 |
1.54 |
1.72 |
1.89 |
2.05 |
2.21 |
2.37 |
2.52 |
2.66 |
| Double Span Beam |
Belastung
q [kN/m2] |
Top layer
= 6.7 mm
Panel thickness |
Top layer
= 13mm
Panel thickness |
20
mm |
26
mm |
30
mm |
35
mm |
40
mm |
40
mm |
45
mm |
50
mm |
55
mm |
60
mm |
65
mm |
70
mm |
75
mm |
| 1 |
1.86 |
2.27 |
2.49 |
2.75 |
2.98 |
2.98 |
3.94 |
4.33 |
4.71 |
5.08 |
5.44 |
5.78 |
6.11 |
| 1.5 |
1.62 |
2.05 |
2.25 |
2.48 |
2.69 |
2.69 |
3.44 |
3.78 |
4.12 |
4.44 |
4.75 |
5.05 |
5.34 |
| 2 |
1.48 |
1.88 |
2.09 |
2.31 |
2.51 |
2.51 |
3.13 |
3.44 |
3.74 |
4.03 |
4.31 |
4.59 |
4.85 |
| 2.5 |
1.37 |
1.75 |
1.97 |
2.18 |
2.37 |
2.37 |
2.91 |
3.19 |
3.47 |
3.74 |
4.01 |
4.26 |
4.50 |
| 3 |
1.29 |
1.64 |
1.86 |
2.09 |
2.27 |
2.27 |
2.73 |
3.00 |
3.27 |
3.52 |
3.77 |
4.01 |
4.23 |
| 3.5 |
1.22 |
1.56 |
1.76 |
2.01 |
2.18 |
2.18 |
2.60 |
2.85 |
3.10 |
3.35 |
3.58 |
3.81 |
4.02 |
| 4 |
1.17 |
1.49 |
1.69 |
1.92 |
2.11 |
2.11 |
2.48 |
2.73 |
2.97 |
3.20 |
3.42 |
3.64 |
3.85 |
| 4.5 |
1.13 |
1.43 |
1.62 |
1.85 |
2.05 |
2.05 |
2.39 |
2.62 |
2.85 |
3.08 |
3.29 |
3.50 |
3.70 |
| 5 |
1.09 |
1.39 |
1.57 |
1.79 |
1.99 |
1.99 |
2.31 |
2.53 |
2.76 |
2.97 |
3.18 |
3.38 |
3.57 |
| Triple Span Beam |
Belastung
q [kN/m2] |
Top layer
= 6.7 mm
Panel thickness |
Top layer
= 13mm
Panel thickness |
20
mm |
26
mm |
30
mm |
35
mm |
40
mm |
40
mm |
45
mm |
50
mm |
55
mm |
60
mm |
65
mm |
70
mm |
75
mm |
| 1 |
1.72 |
2.14 |
2.35 |
2.59 |
2.81 |
2.81 |
3.65 |
4.01 |
4.36 |
4.70 |
5.03 |
5.35 |
5.66 |
| 1.5 |
1.50 |
1.92 |
2.12 |
2.34 |
2.54 |
2.54 |
3.19 |
3.50 |
3.81 |
4.11 |
4.40 |
4.67 |
4.94 |
| 2 |
1.37 |
1.74 |
1.97 |
2.18 |
2.37 |
2.37 |
2.90 |
3.18 |
3.46 |
3.73 |
3.99 |
4.25 |
4.49 |
| 2.5 |
1.27 |
1.62 |
1.83 |
2.06 |
2.24 |
2.24 |
2.69 |
2.96 |
3.21 |
3.46 |
3.71 |
3.94 |
4.17 |
| 3 |
1.19 |
1.52 |
1.72 |
1.96 |
2.14 |
2.14 |
2.53 |
2.78 |
3.03 |
3.26 |
3.49 |
3.71 |
3.92 |
| 3.5 |
1.13 |
1.44 |
1.63 |
1.86 |
2.06 |
2.06 |
2.40 |
2.64 |
2.87 |
3.10 |
3.31 |
3.52 |
3.72 |
| 4 |
1.08 |
1.38 |
1.56 |
1.78 |
1.99 |
1.99 |
2.30 |
2.53 |
2.75 |
2.96 |
3.17 |
3.37 |
3.56 |
| 4.5 |
1.04 |
1.33 |
1.50 |
1.71 |
1.91 |
1.91 |
2.21 |
2.43 |
2.64 |
2.85 |
3.05 |
3.24 |
3.43 |
| 5 |
1.01 |
1.28 |
1.45 |
1.65 |
1.84 |
1.84 |
2.14 |
2.35 |
2.55 |
2.75 |
2.94 |
3.13 |
3.31 |
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
These tables must be used for pre-dimensioning only. |
|
|
An accurate engineering analysis must be carried out
prior to execution in any case. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
Requirements
 |
Even load |
 |
Allowance must be made for the dead load of the
panel |
|
|
|
 |
l = 1 m |
 |
fperm. = l/200. cantilever
fperm. = lk/100 |
 |
Loading on a span basis is not taken into account |
|
|
|
 |
Creep deformations and man loads are not taken
into account in the tables |
|
|
|
 |
Values only apply to K1multiplan in accordance
with permit Z-9.1-242 |
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Top layer at right angle to support |
|
Belastung
q [kN/m2] |
Top layer
= 6.7 mm
Panel thickness |
Top layer
= 13mm
Panel thickness |
20
mm |
26
mm |
30
mm |
35
mm |
40
mm |
40
mm |
45
mm |
50
mm |
55
mm |
60
mm |
65
mm |
70
mm |
75
mm |
| 1 |
0.67 |
0.83 |
0.94 |
1.08 |
1.21 |
1.27 |
1.43 |
1.59 |
1.74 |
1.90 |
2.05 |
2.19 |
2.34 |
| 1.5 |
0.60 |
0.73 |
0.82 |
0.93 |
1.05 |
1.09 |
1.23 |
1.36 |
1.50 |
1.63 |
1.76 |
1.89 |
2.01 |
| 2 |
0.57 |
0.67 |
0.75 |
0.85 |
0.95 |
0.99 |
1.11 |
1.23 |
1.35 |
1.46 |
1.58 |
1.69 |
1.80 |
| 2.5 |
0.54 |
0.63 |
0.70 |
0.79 |
0.88 |
0.91 |
1.02 |
1.13 |
1.24 |
1.35 |
1.45 |
1.56 |
1.66 |
| 3 |
0.53 |
0.61 |
0.67 |
0.74 |
0.83 |
0.86 |
0.96 |
1.06 |
1.16 |
1.26 |
1.36 |
1.45 |
1.55 |
| 3.5 |
0.52 |
0.59 |
0.64 |
0.71 |
0.79 |
0.82 |
0.91 |
1.00 |
1.10 |
1.19 |
1.28 |
1.37 |
1.46 |
| 4 |
0.51 |
0.57 |
0.62 |
0.69 |
0.75 |
0.78 |
0.87 |
0.96 |
1.04 |
1.13 |
1.22 |
1.31 |
1.39 |
| 4.5 |
0.50 |
0.56 |
0.60 |
0.66 |
0.73 |
0.75 |
0.83 |
0.92 |
1.00 |
1.09 |
1.17 |
1.25 |
1.33 |
| 5 |
0.49 |
0.55 |
0.59 |
0.65 |
0.71 |
0.73 |
0.81 |
0.89 |
0.96 |
1.04 |
1.12 |
1.20 |
1.28 |
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| Top layer parallel to support |
|
Belastung
q [kN/m2] |
Top layer
= 6.7 mm
Panel thickness |
Top layer
= 13 mm
Panel thickness |
20
mm |
26
mm |
30
mm |
35
mm |
40
mm |
40
mm |
45
mm |
50
mm |
55
mm |
60
mm |
65
mm |
70
mm |
75
mm |
| 1 |
0.67 |
0.54 |
0.62 |
0.75 |
0.91 |
0.59 |
0.71 |
0.85 |
1.01 |
1.19 |
1.37 |
1.56 |
1.76 |
| 1.5 |
0.60 |
0.51 |
0.57 |
0.67 |
0.80 |
0.55 |
0.64 |
0.75 |
0.88 |
1.03 |
1.18 |
1.34 |
1.51 |
| 2 |
0.57 |
0.49 |
0.54 |
0.62 |
0.73 |
0.52 |
0.60 |
0.69 |
0.80 |
0.93 |
1.06 |
1.21 |
1.36 |
| 2.5 |
0.54 |
0.63 |
0.52 |
0.59 |
0.69 |
0.51 |
0.57 |
0.65 |
0.75 |
0.86 |
0.98 |
1.11 |
1.25 |
| 3 |
0.53 |
0.61 |
0.51 |
0.57 |
0.65 |
0.49 |
0.55 |
0.62 |
0.71 |
0.81 |
0.92 |
1.04 |
1.17 |
| 3.5 |
0.52 |
0.59 |
0.50 |
0.55 |
0.63 |
0.48 |
0.53 |
0.60 |
0.68 |
0.77 |
0.87 |
0.99 |
1.11 |
| 4 |
0.51 |
0.57 |
0.49 |
0.54 |
0.61 |
0.78 |
0.52 |
0.58 |
0.65 |
0.74 |
0.84 |
0.94 |
1.05 |
| 4.5 |
0.50 |
0.56 |
0.60 |
0.53 |
0.59 |
0.75 |
0.51 |
0.57 |
0.64 |
0.71 |
0.80 |
0.90 |
1.01 |
| 5 |
0.49 |
0.55 |
0.59 |
0.52 |
0.58 |
0.73 |
0.51 |
0.56 |
0.62 |
0.69 |
0.78 |
0.87 |
0.79 |
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
These tables must be used for pre-dimensioning. |
|
|
An accurate engineering analysis must be carried out
prior to execution in any case. |
|
|
1) The deflection in the internal field (I) is exceeded. |